Project Summary:Project scale: Crushing system 600,000 tonnes/yearProcessed material: lithium mica oreFinished product size: -3mm P80Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile
Project Summary:
Project scale: Crushing system 600,000 tonnes/year
Processed material: lithium mica ore
Finished product size: -3mm P80
Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile Plant + Vibrating Screen Mobile Plant
Use of finished material: grinding → magnetic separation → re-election

Liming Group's mobile crushing plant series are specially crafted for the metal mining field. These plants are not only highly adaptable, but also meet customers' needs for diversified products, high quality and high production capacity on site. Liming Group always adheres to the concept of providing customers with all-round, systematic and integrated solutions, and is committed to assisting the continuous development and optimisation of the mining industry. With advanced technology and professional services, Liming Group has won wide recognition in the industry.
Advantages in mining projects:
Short cycle time, quick return
Liming crushing mobile plant is designed for short construction period and urgent material projects. Its integrated body eliminates the need for tedious infrastructure construction and rapid deployment, effectively reducing investment costs. Whether it is a construction, road or mineral project, it can respond quickly to ensure efficient project progress.
Flexible and mobile
Liming Group's mobile crushing plant integrated unit is flexible, occupies a small area and is easy to operate. With strong adaptability, it can be quickly transferred to different operating environments and quickly put into production, which greatly improves the efficiency of the project, making it an ideal choice for modern crushing operations.

Advanced technology, reliable equipment
The main equipment adopts advanced hydraulic control technology and mature technology, so that the overall production technology and process equipment are at the advanced level at home and abroad, ensuring the efficient and stable operation of the whole project.
Various models, wide range of application
Liming mobile crushing plant can be adapted to equipment switching to meet customers' various individual needs.
Previous: SMP Crusher
Next: SMP Crusher

Project Summary:Project scale: Crushing system 600,000 tonnes/yearProcessed material: lithium mica oreFinished product size: -3mm P80Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile
Project Summary:
Project scale: Crushing system 600,000 tonnes/year
Processed material: lithium mica ore
Finished product size: -3mm P80
Equipment Configuration: Four Combination Mobile Plant + Impact Crusher Mobile Plant + Vibrating Screen Mobile Plant
Use of finished material: grinding → magnetic separation → re-election

Liming Group's mobile crushing plant series are specially crafted for the metal mining field. These plants are not only highly adaptable, but also meet customers' needs for diversified products, high quality and high production capacity on site. Liming Group always adheres to the concept of providing customers with all-round, systematic and integrated solutions, and is committed to assisting the continuous development and optimisation of the mining industry. With advanced technology and professional services, Liming Group has won wide recognition in the industry.
Advantages in mining projects:
Short cycle time, quick return
Liming crushing mobile plant is designed for short construction period and urgent material projects. Its integrated body eliminates the need for tedious infrastructure construction and rapid deployment, effectively reducing investment costs. Whether it is a construction, road or mineral project, it can respond quickly to ensure efficient project progress.
Flexible and mobile
Liming Group's mobile crushing plant integrated unit is flexible, occupies a small area and is easy to operate. With strong adaptability, it can be quickly transferred to different operating environments and quickly put into production, which greatly improves the efficiency of the project, making it an ideal choice for modern crushing operations.

Advanced technology, reliable equipment
The main equipment adopts advanced hydraulic control technology and mature technology, so that the overall production technology and process equipment are at the advanced level at home and abroad, ensuring the efficient and stable operation of the whole project.
Various models, wide range of application
Liming mobile crushing plant can be adapted to equipment switching to meet customers' various individual needs.
Previous: SMP Crusher
Next: SMP Crusher
Hematite mining and crushing process and required processing equipment introduction
With an investment of about 5.2 billion, CEC Guangdong green mine building materials project chooses Liming which crushing equipment
Xinjiang 800,000 tonnes per annum hematite ore crushing line
How to configure a gravel quarry crushing and sand making line and how much it costs
Construction of Baotou 6 million tonnes per annum magnetite crushing and beneficiation project
Hematite mining and crushing process and required processing equipment introduction
With an investment of about 5.2 billion, CEC Guangdong green mine building materials project chooses Liming which crushing equipment
Xinjiang 800,000 tonnes per annum hematite ore crushing line
How to configure a gravel quarry crushing and sand making line and how much it costs
Construction of Baotou 6 million tonnes per annum magnetite crushing and beneficiation project