In Yantai, a sand and gravel aggregate project with a cost of 168 million yuan is running in an orderly manner, continuously delivering high-quality sand and gravel products for the local high-speed rail construction. The successful implementation and
In Yantai, a sand and gravel aggregate project with a cost of 168 million yuan is running in an orderly manner, continuously delivering high-quality sand and gravel products for the local high-speed rail construction. The successful implementation and efficient operation of this project are inseparable from Shibang's outstanding contributions in equipment selection, production construction and technical support.
In the early stage of project preparation, facing many equipment suppliers on the market, the project party learned about Shibang through word of mouth in the circle. After in-depth consideration and comprehensive evaluation from many parties, Shibang won the trust of the project party with its good industry reputation, advanced technical strength and rich project experience, and the two parties finally reached a cooperation.
In terms of equipment selection, Shibang carefully configured a series of advanced equipment for the project according to the project capacity requirements (500t/h) and raw material characteristics (granite), including 1 F5X feeder, 1 C6X jaw crusher, 1 HST single-cylinder hydraulic cone crusher, 2 HPT multi-cylinder hydraulic cone crushers, 1 VSI6X impact crusher, 4 vibrating screens and dust collectors. These equipments cooperate with each other to form a complete granite production line with an output of 500 tons per hour. Among them, the jaw crusher, as the primary crushing equipment, can efficiently crush large pieces of granite; the single-cylinder hydraulic cone crusher and the multi-cylinder hydraulic cone crusher undertake the task of medium and fine crushing to ensure that the particle size of the material meets the requirements of subsequent processing; the impact crusher further shapes and sands the material to produce high-quality machine-made sand; the vibrating screen accurately classifies the finished products of different particle sizes, and finally produces 5-10-26mm stones and 0-5mm fine machine-made sand to meet the needs of local mixing stations for different specifications of sand and gravel.
In terms of production technology, the project adopts the dry sand and gravel co-export process, which not only improves production efficiency, but also reduces production costs. The entire production line has a reasonable layout, the equipment runs smoothly, and each link is closely connected. At the same time, the project adopts an efficient closed-loop circulation system. The crushing, screening, transportation, finished product storage and other links all adopt a sealed structure and are equipped with efficient dust collection equipment, which effectively reduces dust emissions, achieves standard emissions, and meets environmental protection requirements.
During the project construction, Shibang's rich experience was fully demonstrated. Shibang, the owner and the design institute cooperated well, faced the problems through efficient communication and quickly came up with practical solutions. In addition, the engineers dispatched by Shibang showed comprehensive business capabilities and a serious and responsible work attitude. During the production line construction, they always thought about problems from the customer's perspective, were anxious about the customer's needs, thought about the customer's needs, provided customers with all-round guidance and help, and won high recognition from customers.
Previous: SMP Crusher
Next: SMP Crusher
In Yantai, a sand and gravel aggregate project with a cost of 168 million yuan is running in an orderly manner, continuously delivering high-quality sand and gravel products for the local high-speed rail construction. The successful implementation and
In Yantai, a sand and gravel aggregate project with a cost of 168 million yuan is running in an orderly manner, continuously delivering high-quality sand and gravel products for the local high-speed rail construction. The successful implementation and efficient operation of this project are inseparable from Shibang's outstanding contributions in equipment selection, production construction and technical support.
In the early stage of project preparation, facing many equipment suppliers on the market, the project party learned about Shibang through word of mouth in the circle. After in-depth consideration and comprehensive evaluation from many parties, Shibang won the trust of the project party with its good industry reputation, advanced technical strength and rich project experience, and the two parties finally reached a cooperation.
In terms of equipment selection, Shibang carefully configured a series of advanced equipment for the project according to the project capacity requirements (500t/h) and raw material characteristics (granite), including 1 F5X feeder, 1 C6X jaw crusher, 1 HST single-cylinder hydraulic cone crusher, 2 HPT multi-cylinder hydraulic cone crushers, 1 VSI6X impact crusher, 4 vibrating screens and dust collectors. These equipments cooperate with each other to form a complete granite production line with an output of 500 tons per hour. Among them, the jaw crusher, as the primary crushing equipment, can efficiently crush large pieces of granite; the single-cylinder hydraulic cone crusher and the multi-cylinder hydraulic cone crusher undertake the task of medium and fine crushing to ensure that the particle size of the material meets the requirements of subsequent processing; the impact crusher further shapes and sands the material to produce high-quality machine-made sand; the vibrating screen accurately classifies the finished products of different particle sizes, and finally produces 5-10-26mm stones and 0-5mm fine machine-made sand to meet the needs of local mixing stations for different specifications of sand and gravel.
In terms of production technology, the project adopts the dry sand and gravel co-export process, which not only improves production efficiency, but also reduces production costs. The entire production line has a reasonable layout, the equipment runs smoothly, and each link is closely connected. At the same time, the project adopts an efficient closed-loop circulation system. The crushing, screening, transportation, finished product storage and other links all adopt a sealed structure and are equipped with efficient dust collection equipment, which effectively reduces dust emissions, achieves standard emissions, and meets environmental protection requirements.
During the project construction, Shibang's rich experience was fully demonstrated. Shibang, the owner and the design institute cooperated well, faced the problems through efficient communication and quickly came up with practical solutions. In addition, the engineers dispatched by Shibang showed comprehensive business capabilities and a serious and responsible work attitude. During the production line construction, they always thought about problems from the customer's perspective, were anxious about the customer's needs, thought about the customer's needs, provided customers with all-round guidance and help, and won high recognition from customers.